hydrant flushing program
6 min read

Hydrant Flushing Program Guide for Water Utilities

How water utilities plan a hydrant flushing program: flushing methods, velocity targets, crew work orders, customer notices and the records to keep.

See a 10-minute demo

For US Utilities serving 3,000-100,000 meters and for operations team, billing team and utility managers. For Heads of Billing who own collections accuracy and revenue leakage.

Written by
Sewanti Lahiri
Published on
November 24, 2026
Updated on
November 25, 2026

Hydrant flushing is the practice of opening fire hydrants to move water through distribution mains fast enough to remove sediment and stagnant water and to restore disinfectant residual. A hydrant flushing program plans that work by zone, sends crews out on scheduled work orders, notifies customers before discolored water reaches their taps, and records what crews find. Many utilities run it from the same water utility management software that holds their hydrant, valve and customer records.

What Hydrant Flushing Does

Water does not move evenly through a distribution system. In dead-end mains and low-use areas it sits longer, and the EPA's water age fact sheet explains that older water gives chlorine more time to be consumed, which can allow microbial growth and raise disinfection byproduct levels. Particles and corrosion products also settle in pipes as sediment.

Flushing addresses both problems. The EPA's distribution system flushing fact sheet lists these benefits:

  • Removes stagnant water from dead ends and low-use areas
  • Reduces water age across the flushed area
  • Raises disinfectant residual where it has dropped
  • Lowers bacterial counts and disinfection byproducts in the bulk water
  • Removes loose sediment, biofilm and scale when velocity is high enough

The same fact sheet notes a limit: depending on method and velocity, flushing may only exchange the water, or may loosen sediment without removing it. That is why the method and the flow rate matter as much as the decision to flush.

Utilities flush on a schedule, as routine maintenance, or in response to a problem such as low residual, a positive coliform result or a run of discolored water complaints. The EPA describes scheduled flushing as part of a preventive maintenance program and unscheduled flushing as a response to complaints or water quality changes, the same split covered in the guide to proactive vs reactive maintenance for water utilities.

Which flushing method fits each part of your system?

Conventional, Unidirectional, Spot and Automatic Flushing

The EPA fact sheet describes flushing programs as scheduled or unscheduled, comprehensive or targeted, and conventional or unidirectional. Most utilities combine more than one method.

MethodHow it worksBest forWatch for
ConventionalCrews fully open one or more hydrants and use the available flowQuick response to a complaint areaWater arrives from several directions, so velocity is lower and sediment can spread to nearby customers
Unidirectional (UDF)Crews close isolation valves to direct flow one way, from a clean source to the flushing hydrantCleaning mains system-wide on a planned cycleNeeds mapped valves, a valve sequence for every run, and working valves
SpotCrews flush a single location, such as a dead-end main, on a schedule or when residual dropsKnown problem spots with low water useTreats the symptom; the dead end remains
AutomaticA programmed flusher on a hydrant or blowoff discharges water at set timesLow-use areas that need regular turnoverUnits need checks and the discharge needs a safe drainage path

Unidirectional flushing is the method most programs build toward. A Tata & Howard white paper on UDF explains that conventional flushing moves water in all directions, takes longer and uses more water, while UDF moves water one way, from larger and cleaner mains to smaller and dirtier ones.

What has to be ready before the first crew opens a hydrant?

How to Plan a Hydrant Flushing Program

The EPA fact sheet and the Tata & Howard white paper give a consistent order of work. A first-year program usually follows these steps:

  1. Set the water quality goals. Decide what flushing should achieve, such as a target chlorine residual at dead ends or fewer discolored water calls, as the EPA fact sheet recommends.
  2. Check discharge and flushing rules. Review state and local requirements for flushing and for discharging water, including any dechlorination or storm drain limits.
  3. Inspect valves and hydrants first. Locate, exercise and repair valves and hydrants in each section before flushing it; the City of Liberty, Missouri describes this as a discovery phase in its UDF program.
  4. Divide the system into zones and runs. Group runs into flushing zones and plan each run from a clean source outward, with runs averaging about 1,500 feet, according to the Tata & Howard paper.
  5. Set velocity and pressure targets for each run. Use the hydraulic model to set the flow needed for the target velocity and confirm pressure stays high enough for fire protection in nearby areas.
  6. Notify customers in each zone. Send notices before crews arrive, as the EPA fact sheet lists among the program steps.
  7. Flush, record and update the plan. Record flows, pressures, valve operations and problems on every run, then update maps, the model and next year's plan.

The EPA also suggests coordinating flushing with valve exercising and hydrant testing, since all three put crews at the same valves and hydrants.

Flushing Velocity and Flow Targets

Velocity is what removes sediment. The Tata & Howard paper cites AWWA guidance of a minimum velocity of 3.0 feet per second for UDF, and a minimum of 20 psi of system pressure in the area around active flushing to protect fire flow.

The flow needed to reach 3.0 feet per second depends on the size of the main. The figures below are calculated from nominal pipe diameter; actual inside diameter varies with pipe material and age, so use your hydraulic model for each run.

Nominal main sizeApproximate flow for 3.0 ft/s
6-inchAbout 265 gpm
8-inchAbout 470 gpm
10-inchAbout 735 gpm
12-inchAbout 1,060 gpm

The 8-inch figure matches the white paper's example of just under 500 gpm. If a run cannot reach its target flow, check it against the model before flushing, since the cause is often a closed valve or a main that differs from the map.

Scheduling Flushing Crews With Work Orders

A flushing program is a series of field jobs, each tied to specific hydrants and valves. Treating every run as a work order gives the utility a schedule, an owner for each job, and a record that can be compared year to year. The Tata & Howard paper stresses recording flow, pressure, valve operations, start and end times, and whether the flushing hydrant was throttled.

Work order fieldWhy it matters
Zone, run number and hydrant IDTies the job to the flushing plan and the asset record
Valve sequence, with each valve closed and reopenedConfirms every valve was returned to its normal position
Start time, end time and durationMatches the run to customer calls and system data
Flow rate and residual pressureShows whether the run reached its target velocity
Chlorine residual and turbidity before and afterShows whether the goal for the area was met
Broken valves, hydrants or unexpected conditionsCreates follow-up repair jobs instead of notes on paper

When a crew finds a valve that will not close, does that problem become a repair job the same day, or a note nobody reads?

Mobile work orders let crews record readings at the hydrant instead of on paper forms that are typed in later. For how utilities assign, track and close field jobs, see the guide to work order management for water utilities.

Customer Notices for Hydrant Flushing

Flushing can briefly lower pressure and stir up sediment that reaches customer taps. Notices before crews arrive let customers plan around the work, such as holding laundry until the water clears. A clear notice covers:

  • Where: the zone, streets or map area affected
  • When: dates and working hours, with a note that schedules can shift as crews progress
  • What customers may notice: lower pressure and temporary discolored water
  • What to do: run cold water until it clears and wait to do laundry
  • Overnight work: whether automatic flushers or crews will run outside normal hours
  • Who to call: a phone number for persistent discoloration or pressure problems

Utilities use several channels at once: mailed zone notices, door hangers, automated calls, text and email alerts, and a web map. Portland Water Bureau, for example, publishes where flushing is happening on an online map and tells residents that its crews usually work weekdays from 8:00 am to 4:00 pm, while its automatic flushers typically run at night.

Notices are one part of keeping customers informed during field work, a topic covered more broadly in the guide to improving customer experience at a water utility.

Automatic Hydrant Flushers

Automatic flushers handle the spots crews would otherwise visit again and again. They attach to a hydrant or blowoff and open on a programmed schedule to turn over water in low-use areas.

The EPA flushing fact sheet gives a small-system example: a utility serving 6,000 people struggled to keep a disinfectant residual above 0.1 mg/L at the far ends of its system. It installed automatic flushing units in three problem areas, and free chlorine residual rose above 0.2 mg/L in those areas. Portland Water Bureau describes its autoflushers as programmed to run for specific amounts of time in neighborhoods where water quality needs regular attention.

Automatic flushers do not remove the cause. The EPA water age fact sheet lists design fixes such as eliminating dead-end mains by installing pipe to form a closed loop. Flushers are often the interim measure while that work is planned.

What Flushing Reveals About Your System

Flushing tests the distribution system as well as cleaning it. Flow and pressure that do not match the plan usually point to a specific problem, and the Tata & Howard paper notes that differences in flow from year to year should be investigated.

Finding during flushingLikely causeFollow-up
Flow or pressure well below the planA valve left closed or a broken valveCheck valve positions in the run, then open a repair job
A valve that cannot be operatedValve in poor conditionRepair or replace, and update the valve record
Flow that does not match the mapped main sizeMain size or connections differ from recordsFlow test the area, then correct the map and model
Water that will not clearHeavy sediment or tuberculationRepeat the run, raise velocity, or plan cleaning or replacement

Closed valves are a real risk. The EPA water age fact sheet describes a large system that found 44 isolation valves closed during maintenance and never reopened, which led to high water age and coliform problems until valves were repaired and the area was spot flushed.

Hydrant records matter here too. Every hydrant should be in the asset inventory with its location and condition, including hydrants on private property; the guide to private hydrant billing covers how utilities set those up as a billable service.

Where SMART360 Fits

SMART360 by Bynry is a cloud platform for water, electric and gas utilities serving 3,000 to 100,000 accounts. For a flushing program, the relevant parts sit in one system:

  • Assets: hydrants, valves and mains recorded with location and condition
  • Work orders: flushing runs and follow-up repairs scheduled and assigned to crews
  • Mobile field app: readings and problems recorded at the hydrant
  • Customer accounts by service location: the addresses a flushing zone affects
  • Customer notices: messages sent from the same account records
  • Reports: completed runs and open repairs for supervisors and boards

SMART360 connects to other systems through 25+ pre-built integrations, more than 50,000 accounts are live on the platform, and customer retention is 95%.

See SMART360 in Action. See work order and field service management in SMART360, from scheduled job to closed repair.

Frequently Asked Questions

What is hydrant flushing?

Hydrant flushing is opening fire hydrants to move water through distribution mains fast enough to remove sediment and stagnant water and to restore disinfectant residual. Utilities do it on a schedule as routine maintenance or in response to water quality problems.

How often should hydrants be flushed?

It depends on the goals and the system. Many utilities flush the whole system on a yearly cycle and flush problem spots more often. The Tata & Howard UDF paper notes that annual unidirectional flushing helps prevent sediment and tuberculation buildup.

What is unidirectional flushing?

Unidirectional flushing (UDF) closes selected valves so water moves one way, from a clean source toward the flushing hydrant. The EPA says this limits the spread of sediment and produces higher velocity than conventional flushing.

Does hydrant flushing waste water?

Flushing uses water, but it is planned maintenance. Unidirectional flushing uses less water than conventional flushing because each run is shorter and reaches higher velocity, according to the Tata & Howard white paper.

What velocity is needed for hydrant flushing?

AWWA guidance cited in the Tata & Howard white paper recommends at least 3.0 feet per second, with at least 20 psi maintained in the surrounding area. For an 8-inch main, that is just under 500 gpm.

Conclusion

A hydrant flushing program turns a routine maintenance task into planned, recorded work. Set water quality goals, inspect valves first, plan zones and runs from clean to dirty, hit the velocity target, notify customers, and record every run so problems become repair jobs and next year's plan improves. The water utility management software page shows how SMART360 keeps hydrant records, work orders and customer accounts together for that work.

About Two Cta Image

Ready to see how SMART360 fits your utility?

Book a personalized demo with the SMART360 team and see how SMART360 fits your utility?

Related Post From This Category