backow testing
6 min red

Backflow Testing: How Water Utilities Run an Annual Program

How water utilities run an annual backflow testing program: assembly inventory, due dates, notices, report review, failed tests and records.

See a 10-minute demo

For US Utilities serving 3,000-100,000 meters and for operations team, billing team and utility managers. For Heads of Billing who own collections accuracy and revenue leakage.

Written by
Sewanti Lahiri
Published on
November 23, 2026
Updated on
November 25, 2026

Backflow testing at a water utility is an annual program: the utility keeps a list of every backflow prevention assembly in its service area, tells each owner when a test is due, collects the licensed tester's report, and follows up until every failed or overdue assembly passes. The work is mostly records and reminders tied to customer accounts and service locations, which is why many utilities run it from their water utility management software rather than a separate spreadsheet.

What a Backflow Testing Program Covers

A backflow test is a field check, done by a certified tester with a differential pressure gauge, that confirms an assembly still stops water on the customer's side from flowing back into the public supply. Testing a single assembly takes minutes. Running a program means doing that for every assembly in the service area, every year, and proving it to the state.

In Texas, assemblies that protect against health hazards must be tested at installation and at least once a year by a licensed tester, and the water system keeps the reports for at least three years, as TCEQ's cross-connection control guide (RG-478) explains. Most programs have five parts:

  • An inventory of every assembly, where it is, what it protects against and who owns it
  • A due-date schedule so no assembly goes more than 12 months between tests
  • Notices that tell owners a test is due, overdue or failed
  • Report intake and review so each test result is checked before it is accepted
  • Follow-up and records so failures are repaired and every result can be produced for an inspector

Who Does What in a Backflow Testing Program

Responsibility is shared. The water utility runs the program, the property owner pays for the assembly and its test, and a licensed tester does the work. RG-478 also names the plumbing or building department, the fire marshal's office and permitting staff as partners, because their codes overlap with the utility's rules.

RoleResponsibility in the annual cycle
Water utilityKeeps the inventory, sends notices, reviews and files reports, enforces deadlines
Property owner or customerArranges and pays for the test, makes repairs, keeps the assembly in working order
Licensed testerTests to the approved procedure, repairs and retests, signs and submits the report
Plumbing or building departmentEnforces the plumbing code's backflow rules inside the property
Fire marshal or fire-line contractorCovers assemblies on fire sprinkler lines, which have extra tester rules

RG-478 recommends written protocols between departments for sharing information, storing records and showing where one department's authority ends and another's begins. Backflow rules sit alongside the other drinking water rules covered in the guide to US water utility regulations and compliance.

How to Build the Assembly Inventory

The inventory is the base of the program. If an assembly is not on the list, it never gets a notice, and nobody notices when it stops being tested. The TCEQ-20700 test and maintenance report and the report fields Austin Water requires point to the details worth recording for each assembly:

  • Service address and location on the premises
  • Account and owner name, with the owner's mailing address
  • Cause requiring protection, such as irrigation, a boiler or a private well
  • Assembly type (RP, double check, PVB or SVB)
  • Manufacturer, model, size and serial number
  • What the assembly serves (domestic line, irrigation, fire line)
  • Containment at the meter or internal protection at a point of use
  • Install date and reason for the last test (new, existing or replacement)
  • Last test date, result and tester license number
  • Next due date

New assemblies enter the list from several directions: customer service inspections, plumbing permits, new connections and irrigation installs. RG-478 notes that licensed irrigators may install assemblies on irrigation systems, but a licensed tester must still test them at installation. It also gives the example of a meter reader who noticed new equipment arriving at a facility, which led the utility to require a reduced pressure assembly at the meter. Field staff who know what to report are one of the best sources of inventory updates.

For how Texas divides drinking water, rates and service area rules between regulators, see the Texas water utility regulations guide.

Does every assembly in your service area have a next test date on file today?

How to Run the Annual Backflow Test Cycle

Once the inventory is in place, each assembly moves through the same cycle every year:

  1. Set the due date from the last passing test. The TCEQ form instructions say annual testing of health hazard assemblies is to occur no more than 12 months from the last test date, so the next due date follows from each passing result.
  2. Send a test-due notice before the deadline. RG-478 recommends telling the customer the assembly is due, that water will be off during the test, and what enforcement follows if it is not tested.
  3. Let the owner arrange a licensed tester. RG-478 describes three payment routes: the utility tests with its own staff for a fee, the customer hires a licensed private tester, or the customer chooses either.
  4. Collect the signed report. In Texas, the tester gives the signed original report to the water system. Austin Water, for example, requires testers to submit each report online on the day of the test.
  5. Review the report before accepting it. Check that the form is complete, the assembly passed, the gauge was tested for accuracy and the tester's license is current; reject incomplete forms.
  6. Record the result and reset the due date. File the report against the assembly, the service location and the account, and set the next due date.
  7. Follow up on anything overdue or failed. Move the assembly into the failed or overdue process until a passing report is on file.

Testing an assembly means shutting off water to the property. RG-478 notes that some sites, such as hospitals, install two assemblies side by side so one can be tested while the other keeps water flowing.

Test-Due and Overdue Notices

Notices do most of the work in a program. Each one should tell the owner exactly what to do and by when. The table below follows RG-478 guidance; the timing and enforcement steps come from each utility's own ordinance or service agreement.

NoticeWhen it goes outWhat it says
Test dueBefore the due dateWhich assembly is due, the deadline, that water will be off during the test, how the tester submits the report
OverdueAfter the due date passes with no reportThe new deadline and the enforcement step that follows under local rules
Failed testAfter a failed report arrivesThe repair deadline and the requirement for a passing retest
Final noticeBefore enforcement startsThe date of the next step, such as a citation or service interruption

RG-478 says a test-due notice may include a list of local licensed testers, with a disclaimer that the list is not an endorsement, or a link to TCEQ's online license search. Volume matters too: the San Antonio Water System sends residential reminders for lawn irrigation assemblies quarterly.

When a report comes back failed, who owns the follow-up, and how will you know it is closed?

Handling Failed Tests and Noncompliance

A failed test needs a clear owner and a deadline. RG-478 asks testers to send failed reports to the water system as well, and suggests the utility decide its response by looking at the risk posed by the connection, the cause of the failure, the time needed to correct it, the date for a follow-up test and how to monitor the assembly until it passes.

Utilities treat a failure as an open item, not a result. San Antonio Water System, for example, considers submitting a report with a failed result a delinquency until the assembly is repaired and retested. Enforcement then escalates under local rules. Madison Water Utility notes that repeated failure to perform or report the annual test may result in a citation, and RG-478 says a Texas water system may terminate service where an unprotected health hazard is found until the hazard is isolated.

Each follow-up step is a task with a due date, an assignee and a result, which is the same shape as field work. Many utilities manage it the way they manage repairs and inspections, as covered in the guide to work order management for water utilities.

Records to Keep for Compliance

State inspectors ask to see the records, so retention rules matter. Texas sets these minimums in RG-478:

RecordHow long to keep itSource
Backflow test and maintenance reportsAt least three years30 TAC 290.46, as stated on the TCEQ-20700 form
Customer service inspection certificatesAt least 10 years, or as a permanent recordTCEQ RG-478
Test reports for internal cross-connection programsOn file with the water purveyor30 TAC 290.44(h)(1)(B), as quoted in RG-478
Tester license and gauge accuracy detailsWith each report, to confirm the test was validTCEQ-20700 form

Electronic records need care in Texas. RG-478 treats an electronic test form as an alternate form that needs TCEQ approval, and says approval is requested system by system. A tester's own username and password act as their signature, so office staff cannot enter results for every tester under one shared login. The utility must also be able to produce hard copies during a compliance inspection.

Keeping these records consistent is part of the wider reporting work described in the guide to water utility compliance software.

Choosing How to Track the Program

RG-478 notes that keeping track of the locations and due dates of every assembly can be complicated, and that utilities either buy software built for the task or develop their own tracking system. The choice usually comes down to one of three options.

OptionWorks whenWatch for
SpreadsheetA small number of assemblies and one person running the programDue dates and owner changes drift from the account records
Dedicated backflow tracking softwareA large program with many outside testers submitting reportsA second system to keep in step with accounts and work orders
Records in the utility's account and field work systemThe utility wants assemblies tied to service locations, accounts and follow-up tasksTester submission and state form rules still need to be met

Whichever option you choose, RG-478 lists questions worth asking of any electronic system. A short version:

  • Does it flag values entered outside acceptable limits?
  • Does it alert the utility when an assembly fails a test?
  • Does it record that an assembly failed, was repaired and then passed?
  • What happens if a tester completes a test while the system is unavailable?
  • Can it confirm that the tester was on site?

Can your team pull a list of every overdue assembly today, with the account, owner and last notice date attached?

How SMART360 Supports a Backflow Testing Program

SMART360 by Bynry is a cloud platform for water, electric and gas utilities serving 3,000 to 100,000 accounts. It keeps customer accounts, service locations, assets, work orders and customer notices in one system, so the records a backflow program depends on sit with the account and property they belong to, and follow-up work can be opened and closed from the same record.

More than 50,000 accounts are live on the platform, customer retention is 95%, the service runs under a 99.9% uptime SLA, and SMART360 is SOC 2 certified. A typical go-live takes 20 to 24 weeks.

See SMART360 in Action. Book a walkthrough with a sample of your own service locations and assembly records.

Conclusion

Backflow testing works as a program when every assembly is on the list, every owner gets a clear notice, every report is checked before it is filed, and every failure is followed until it passes. The state sets the minimums, local rules set the deadlines and enforcement, and the utility's records show whether the program is working. Keeping those records with the account and service location makes the annual cycle easier to run. The water utility management software page shows how SMART360 brings accounts, assets and field work together.

Frequently Asked Questions

How often is backflow testing required?

Most utilities require a test when an assembly is installed, after a repair or relocation, and at least once a year. In Texas, assemblies that protect against health hazards must be tested at least annually, no more than 12 months after the last test. Local rules can require more frequent testing.

Who is responsible for backflow testing, the utility or the customer?

The property owner usually arranges and pays for the test and any repairs. The water utility runs the program: it keeps the inventory, sends notices, reviews reports and enforces deadlines. Some utilities test assemblies with their own licensed staff for a fee.

What should a backflow test notice include?

A test-due notice should name the assembly and its location, give the deadline, warn that water will be off during the test, explain how the tester submits the report, and state the enforcement step if the test is not done. Some utilities add a list of licensed testers with a disclaimer that it is not an endorsement.

What happens when a backflow test fails?

The assembly must be repaired and retested before it counts as passing. The failed report still goes to the utility, which sets a repair deadline and follows up. Repeated failure to test or repair can lead to citations, and in Texas a utility may terminate service where an unprotected health hazard exists.

How long should a utility keep backflow test records?

In Texas, backflow test and maintenance reports must be kept for at least three years, and customer service inspection certificates for at least 10 years or permanently. Other states set their own retention rules, so check your state drinking water program.

About Two Cta Image

Ready to see how SMART360 fits your utility?

Book a personalized demo with the SMART360 team and see how SMART360 fits your utility?